Weirton Frontier Crossings utility infrastructure to support a heavy industry.

  • Will accommodate prospect demands
  • Build to suit options available
  • Utility provider support with planned development
  • See utility information below.

For more information and leasing rate, please

Power

 

  • Power is provided to WFC from First Energy via a 138 kV substation. This substation is regularly maintained and is protected by a large 16 ft tall fence.
  • The sources of power at the site borders are:
    • 138 kV transmission feed
    • 132 kV transmission feed
    • 25 kV distribution feed
    • 12.5 kV distribution feed
  • FGC has inventory of transformers available on site for use or sale (1 kVA – 900+ MVA)

Water

 

Public Water:

  • Public potable water is provided by the City of Weirton
  • 12” plastic line at property border
  • Total system capacity of 8,000,000 GPD
  • Excess system capacity of 4,400,000 GPD

Private Water:

  • River water access for high volume raw water source
  • Over 50,000,000 GPD capacity available

Sanitary/Wastewater

 

Public:

  • Public sanitary/wastewater treatment provided by the City of Weirton
  • 14 – 30” plastic and ductile iron lines at property border
  • Total system capacity of 8,000,000 GPD
  • Excess system capacity of 4,600,000 GPD

Natural Gas

 

  • Distribution Gas (Mountaineer Gas, LDC)
    • There is a 12″ steel gas main line and dedicated meter and regulating set for the development of Weirton Frontier Crossings. This system has a capacity of 2,000+ MCF/hr and has a 210 psig maximum allowable pressure. 
    • There is also an 8″ steel medium pressure system adjacent to another part of the site.  
  • Transmission Gas (TC Energy)
    • Two transmission gas supplies at site both provided by TC Energy.
    • The first is a 210 psig MAOP system  (12″ steel) and the second is a 175 psig MAOP system (10″ steel). The line is 12″ in size. 
    • This system has a capacity of over 2,000 MCF/hr and borders the entire developable site.
  • Distribution gas available on site via Mountaineer Gas (12″ steel)
  • Transmission gas available on site via TC Energy (12″ steel)
  • Over 2,000+ MCF/hr capacity available for natural gas
  • Medium and low pressure distribution system also avilable
  • Meter and regulating provided on site

Natural Gas

 

  • Transmission Nitrogen (Messer Gas)
    • A transmission grade nitrogen system borders the entire property
    • This system operates at 400 psig MAOP and has significant capacity available. This is a 12″ steel transmission line.
    • An existing Meter and Regulating set is on site
  • Transmission Oxygen (Messer Gas)
    • A transmission grade high purity oxygen system borders the entire property
    • This system operates at 400 psig MAOP and has significant capacity available. This is a 16″ steel transmission line.
    • An existing Meter and Regulating set is on site
  • Hydrogen (Private Industry)
    • Steam methane reformer on site which produces hydrogen for industry
    • 600,000+ scf/day available
  • Transmission grade nitrogen on site via Messer Gas (12″ steel)
  • Transmission grade high purity oxygen on site via Messer Gas (16″ steel)
  • Hydrogen gas available in abundant capacity on site

Fiber Optic/Telecomm

 

  • Above ground and buried fiber optic available at site
  • 2+ GB/s speeds in area
  • Comcast, Horizon, Verizon, T-Mobile all available at site
  • Redundant loops can be provided for manfacturers