For more information
Purpose-built transportation infrastructure provides Weirton Frontier Crossings with the connectivity and capacity required for modern industrial, manufacturing, and logistics operations.
- Direct access to West Virginia State Route 2.
- Less than 2 miles from U.S. Route 22.
- Convenient access to Interstates 70, 376, 79, and 77, connecting the site to key Midwest, Northeast, and Mid-Atlantic markets.
- Approximately 15 miles from Pittsburgh International Airport, providing access to domestic and international air cargo services.
- Multi-phase 3+ mile industrial access road network planned throughout the site, with Phase I completed.
- Designed to accommodate heavy truck traffic, oversized loads, and industrial freight movements.
- Strategic tri-state location serving West Virginia, Ohio, and Pennsylvania markets.
1.5
to US-22
15
to I-376
15
to Pittsburgh Intl. Airport
13+ M
Road Funding Secured
Road Infrastructure
Industrial Access Road - Phase 1
Description:
- Construction Completed: Summer 2024
- Roadway Name: Iron Way
- Approximately 5,000 linear feet of new two-lane industrial access roadway constructed to support redevelopment and future growth throughout Weirton Frontier Crossings.
- Provides primary access to Form Energy’s manufacturing facility and multiple development parcels within the industrial park.
- Connects West Virginia State Route 2 (Pennsylvania Avenue) to Main Street and Avenue C, creating enhanced site circulation and freight access.
- Designed to accommodate industrial traffic, commercial vehicles, and future site development.
- Funded through the West Virginia Department of Economic Development as part of the state’s commitment to advancing economic growth and industrial investment in the region.
- Serves as the first phase of a planned 3+ mile industrial roadway network that will support continued expansion and development throughout the site.
Industrial Access Road - Phase 2
Description:
- Approximately 5,000 linear feet of new industrial access roadway extending south from Iron Way to the Lee Avenue / Cove Road intersection.
- Phase II of the planned 3+ mile Weirton Frontier Crossings industrial access road network.
- Provides direct access to Parcel A and Parcel C, supporting future industrial, manufacturing, logistics, and technology development.
- Functions as the City of Weirton’s industrial bypass route, improving freight mobility and reducing truck traffic on local roadways.
- Creates the most direct route between Weirton Frontier Crossings and U.S. Route 22, providing efficient access to regional and interstate highway networks.
- Designed to accommodate heavy truck traffic, oversized loads, and industrial freight movements.
- Enhances site readiness and supports future development across key areas of the industrial park.
Industrial Access Road - Phase 3
Description:
- Approximately 4,000+ linear feet of new industrial access roadway extending north from the existing roadway network to Parcels I and J, with additional roadway construction on Browns Island.
- Provides critical access to Browns Island and Parcels L and M, unlocking more than 240 acres of flat, development-ready industrial land for future investment.
- Includes construction of a new railroad crossing, with $1 million in funding already awarded through the Federal Railroad Administration (FRA).
- Includes planned improvements to the Browns Island Main Channel Bridge, enhancing vehicle access, freight mobility, and long-term development potential for the island.
- West Virginia Division of Highways (WVDOH) to assume ownership and maintenance responsibilities for the roadway and bridge infrastructure upon completion, ensuring long-term public access and infrastructure stewardship.
- Creates direct access to some of the site’s largest contiguous industrial development parcels, supporting advanced manufacturing, energy, logistics, and technology users.
- Designed to accommodate heavy truck traffic, oversized loads, and industrial freight movements.
- Supports the continued expansion of Weirton Frontier Crossings by opening strategic waterfront and industrial development opportunities.
Certified Truck Scale
Description:
- Certified truck scale at site
- Scale house and administrative trailers at location
Commodity Handling
Aggregates
Steel
Supersacks
Lumber
Paper / Palletized Loads
Dimensional Loads
Dry Bulk
Liquid Bulk
Dry Bulk Food Grade
Liquid Bulk Food Grade
Storage & Transportation
Warehousing
- Warehouse on site: Yes
- Quantity: 2
- Warehouse Storage (SQ. FT.): 10,000 – 40,000 sq ft
- Warehouse Refrigeration: Can build to suit
- Overhead Crane(s): Yes (x2 8-ton)
- Rail into building: Can build to suit
Yard Storage
- Yard Storage: Yes
- Storage Size (acres): 500+ acres
- Divisible lots
Other Equipment On Site
Air Compressor
Certified Truck Scale
Conveyor
Crane
Forklift
Excavators
Generator
Power
Containment
Learn more about Aggregate & Equipment
